WATER PIPELINES
IN THE WESTBANK

A reliable, suitable and dependable source of water made available through securing additional quantities of water for the targeted areas increasing their average consumption of water to reach 80 l/c.d. The expected impact from this project is as follows:

  • Improving the pressure within the main pipeline and network as the new pipeline is installed.
  • Increase the per capita available and therefore domestic consumption of drinking water, where at the moment the consumption rate is about 40 l/c/d, is to increase to about 80 l/c.d.
  • Enhancing the income of some households by saving the money paid for purchasing water from mobile water tank at cost of 30 NIS/ m3.
  • Enhancing the hygienic practices and safeguarding the quality of water and reducing the risk of public health and water borne diseases as a result of drinking polluted water.